Tower Crane Operator Required Immediately

1) Operates tower crane to lift and move building materials from ground storage areas and trucks to top of building under construction: Climbs ladder inside vertically mounted tower to gain access to control pad suspended under crane boom.
2) Pushes or pulls levers on control console to rotate counter-balanced horizontally mounted boom to extend or retract trolley along boom, and to raise and lower hook to which loads are attached.
3) Controls crane movement in response to hand signals or radio commands by supervisor or signaler.
) May operate crane from remote console on top of building.
5) May operate radio-controlled crane.

Short Info

  • Published:8 years ago
  • Company:Private Company
  • Location:Dubai,UAE
 
 
 

Resume Action Verbs: You took the initiative

Resume Action Verbs:

You took the initiative
If you’ve made a difference in your workplace by taking the initiative, showcase it on your resume with one of these verbs:
Anticipate
Spearhead
Forecast
Carry out
Undertake
Deliver
Handle
Volunteer
Overhaul
Improve
Shoulder
Endeavor
Specialize
Commit